Home  /  Offerings  /  Turnkey Data Centers

Ready to Occupy

Turnkey Data Centers

Finished, commissioned halls with power, cooling, security, and operations live from day one.

Finished data hall with rows of commissioned racks in a turnkey Basaltline facility

Capacity you can move into this quarter

Turnkey halls are finished to enterprise grade before you sign: raised or slab floors loaded with cabinets, cooling commissioned, security online, and fiber already diverse into the building. You bring the servers.

It is the fastest route to live capacity on a Basaltline campus — ideal for cloud regions, AI inference rollouts, and enterprise migrations with a fixed date. Scale hall by hall as demand grows.

Long corridor of lit server racks inside an operating turnkey data hall

Commissioned halls, ready for your racks.

What’s included

Every turnkey data centers engagement covers these six elements — scoped to your capacity and timeline.

  • Finished data halls. Powder-white or gray space options, hot/cold containment, and densities from 10 to 50+ kW per rack.
  • Live power & cooling. UPS, generators, and chilled-water or DX plants tested under load before your move-in.
  • Physical security. Mantraps, biometrics, CCTV retention, and 24/7 on-site security staff.
  • Carrier-neutral fiber. Diverse entrances and meet-me capacity to regional carrier hotels and cloud on-ramps.
  • Remote hands. Certified technicians for installs, reboots, media handling, and escorted access around the clock.
  • Operating SLA. Contracted uptime, response times, and reporting — backed by service credits.

How it works

A five-stage path from first conversation to live capacity — with clear gates and open-book reporting throughout.

1. Tour

Walk the actual hall, meet the ops team, and review commissioning records.

2. Configure

Lock rack layout, densities, power draws, and network cross-connects.

3. Contract

Straightforward lease with transparent power pass-through and SLA terms.

4. Move in

Phased installs with remote-hands support and escort scheduling.

5. Operate

Steady-state operations with quarterly reviews and capacity planning.

5MW+Leasable blocks per hall
90 daysTypical tour-to-live timeline
24/7Staffed security & remote hands
50+ kWHigh-density rack support

Common questions

Standard halls support 10–20 kW per rack, with high-density zones engineered for 50 kW and above for AI clusters — including liquid-cooling readiness.

Utility power passes through at cost with a fixed management fee, metered per deployment. No hidden uplifts; monthly reports show every kilowatt-hour.

Yes — turnkey customers get first right on adjacent halls and powered-shell buildings on the same campus.

Start your turnkey data centers project

Share your capacity targets and timeline — we’ll respond within one business day with next steps and a site shortlist.